Category Archives: Phil

Phil 11.27.12

8:00 – 2:00 ESSO

  • Discussion with Lenny and Dong about how to read in cognos data and use it to populate the FACTS fields in PPM and PA.
  • Backups
  • Working on the JDeveloper JSF tutorials – managed to crash JDeveloper.
  • Talked to Dong about next dev environments. We discussed Adobe and Netbeans in addition to what we’re using now. My thought is that if we can make a table and chart that allow us to visualize data sitting in a DB here and on site, we have a viable option. If it’s open source and supported by a player unlikely to go out of business any time soon, then so much the better.

2:00 – 4:00 FP

  • Qualitative Methods.

Phil 11.26.12

8:30 – 4:30 ESSO

  • Backups
  • More interaction with Don abo0ut what kind of visualizations he wants. Printed out a description of the putative table that we need to produce. Dong and I will try to code it tomorrow in site.
  • Put together FlexiCharts of ACC, since that appears to have vanished.
  • Got started back on JDeveloper and ADF.

Phil 11.21.12

8:00 – 4:00 ESSO

  • Meetings with everyone, Dan, Lenny, Chris.
  • Backups
  • 2:00pm meeting with Kristen
    • Meeting went well. I basically walked through how to use the Data Visualization and how PPM and PA generated data and where it was stored. We then talked about generating more graphics for her and how scripting could produce the tables she (implicitly) needs for the charts she wants.

Phil 11.20.12

7:30 – 2:30 ESSO

  • Deployed new PPM and IM
  • Discussions with Don about progress
  • Said hello to Chris
  • Discussions with Lenny, Carla and Tangie about progress
  • Discovered that the IM was broken on fgmdev, and I had forgotton how the system was set up. After a bit of help from Dong, fixed and updated the Vis2 and IM SWFs.

2:30 – 3:30 FP

  • Interview with Allison Y

Phil 11.19.12

7:30 – 10:00, 12:00 – 3:30 ESSO

  • Updated the truststore file on the server
  • Backups
  • Some discussions with Don about progress
  • Cleaning up the login screen on Vis2
  • Cleaning up the version info on Ingest Manager
  • Due to some different configuration data between Dong’s environment and mine, spent a few hours fishing for red herrings. Done now thoug, with a new build for tomorrow.

10:00 – 12:00 – FP

  • Contextual user interface design and metaphors

Phil 11.16.12

7:30 – 9:30, 11:30 – 3:30 ESSO

  • Backups
  • Working on new password
  • Looking onto Oracle ADF
    • Downloaded the Eclipse version, but it doesn’t seem as nice as JDeveloper that Dong’s using. Going to pull that one down next
    • Very nice! Need to see how to integrate with subversion

9:30- 11:30 FP

  • AV scheduling meeting

Phil 11.15.12

8:00 – 2:00 ESSO

  • Backups and meetings, oh my.
  • Working on getting Don and Lenny to focus on “report wishlists”. Meeting in two weeks to discuss?
  • Found a “duplicate project” bug(?) for Dong. He says that there are a set of criteria that Trish layed out that might be getting triggered. Need to look into that.
  • Need to clear out old password when changing password.

2:00 – 4:00 FP

  • Qualitative methods. Need to look into developing data dictionary-based mechanism for that which is able to point into AV stream.

Phil 11.14.12

8:00 – 4:00 ESSO

  • Deployed new versions of PPM, PA (new view only permissions), and Vis2 (bug fixes). Checked the fact that the bug fixes in fact do work by having Dan, my favorite bug-finding user try out this system.
  • Cleaned out old backups to free up disk space. All teh backups are still on the network drive, so this was redundant. Still keeping the most recent backups on the server in case everything goes down and I lose connectivity with the network drive, since that’s happened before.
  • Back to GWT. Rather than the book, I’m going to try something quicker. We’ll see if Google keeps up on its own technology well.
    • Made a GWT_HOME environment variable so that I can run webAppCreator.
    • That seems to be working well. Even ran everything from the command line.
    • Importing it into the IDE didn’t result in a project that was recognized as a GWT project. Had to re-create it in the IDE.
    • Stockwatcher (again)

Phil 11.8,9.12

8:00 – 4:00

  • Meeting with Lenny and Don about VisTool. After a lot of going around, they want more (as yet unspecified) scripts. After having now interacted with Ray (An actual user!), I want to have fewer Financial Mitigation pages popped up at people who have no money to spend yet.
  • Was able to replicate the freeze problem. If the user has not set up any “desktop” styles, the objects that define the panel borders are null, which freaks the color calculations out. I added traps for that, and also experimented with what the best change in the ‘per wedge’ hue rotation in a pie chart is. It looks like it’s 23 degrees, and I took out the code that varies it as a function of the hue difference between the panel bg and border.
  • Committed all changes and burned the new vis2, PPM and PA to disk.

Phil 11.5.12 – 11.6.12

11.5.12: 7:30 – 9:30, 1:00 – 4:00 ESSO

  • Backups
  • Deployed release versions of everything.
  • Meeting with Morpheus folks. Demoed everything, and they are interested. Had an odd experience, where the chart view in the data visualizer froze. Upon reloading, everything was fine.

11.5.12 10:00 – 1:00 FP

  • 810, then video production presentation

11.6.12: 730 – 2:00 ESSO

  • Backups
  • Wrote up meeting notes for Dave W.
  • Jim G. wants status for October
  • Set up a bunch of users for Data Visualization. When showing one how things work, I ran into the freezing problem again. I reset the deployed code to be the debug build, and can’t get it to happen on my box, but it happens on his. I need to test further. Not even sure how to debug this one yet.
  • Experimenting with using Google Drive to hold my Eclipse development directory. If it works, then there is always a snapshot of the current codebase. THis doesn’t replace SVN, which hold the ‘working’ codebase. Instead, this is the version that each user is working on, before it’s shared.

2:00 – 4:00 FP

  • 805, and a bit of coding to determine Levenshtein distance for strings.

Phil 11.2.12

8:00 – 11:00,  12:00 – 4:00 ESSO

  • Deployed yet another version of vis2. I think it’s free of any ‘stupid’ errors, at any rate.
  • Monday 2:00 Morpheus meeting
  • Wednesday 9:30 VisTool walkthrough
  • Announded the URN victory
  • Compiled and burned release builds of other VISIBILITY apps.

11:00 – 12:00 FP

  • Meeting with Bill Shewbridge. Looks like studio time on Nov 20 or Dec 4. Preference for Nov 30.

Phil 11.1.12

8:00 – 2:00 ESSO

  • We have our VizTool URN!
  • Looks like next week for Morpheus
  • Interview today?
  • Discovered a small bug today when deploying the new version. Although data tips for other items are able to use HTML, tips for pie charts don’t. Pulling out the offending code .
  • Talked to Dong about passing variables into SQL, and about creating some release builds to evaluate.
  • Burning a new disk

2:00 – 4:00 FP

  • More papers and HCC foundations

Phil 10.31.12

8:00 – 4:00

  • Backups and discussions with folks on site. Working on getting a meeting set up with the Morpheus folks.
  • fgmdev.com was down. Dong and I spent most of the morning trying to get it up. That you are reading this means success!
  • Working on adding color code. Incorporated and working nicely!
  • Checking code in
  • Burning a disk

Phil 10.30.12

10:00 – 12:00 ESSO

  • Still wet, but no wind to speak of. Cold – in the 30’s. We apparently got 80 mph gusts and I’d believe it.
  • Updated the WP engine for this blog.
  • Looking at some papers about User Interface/ Experience to see how the Alert Manager App should be built.

12:00 – 2:00 FP

  • Reading “Facilitators and Barriers to Adopting Robotic-Assisted Surgery:  Contextualizing the Unified Theory of Acceptance and Use of Technology”. I want to find a rule for User Interface adoption