- PA Status bug not fixed
- getting Current for incomplete projects
- got ************* should not reach here !!!!! ******************** message, may be related?
- Metting with Chris, Lenny, Tangie, Carla
- Proposed changes ( added to Req’s)
- Contract # should be a blank text field in Enter Invoice Diaglog
- Delete “Reported Outlay” from all views (PPM and PA)
- Fix DB so that the greater amount of PM Actuals or Reported Outlay is copied into the lower field. Also copy FMP.
- Default to “Reporting Month”
- For any row that is less than 100% use only those rows to calculate “incomplete” and “due”. When all rows are 100%, the item is current forever.
- “Planned Outlay” becomes “Spend Plan Baseline”
- For any row that equals 100%, auto-fill through the end of the contracts in PA (same rule as PPM)
- No tool tip in PA list view
- Proposed changes ( added to Req’s)
- finished up Security Briefing and sent in the Acknowledge form
Category Archives: VISIBILITY
Phil 1.4.13
8:00 – 4:00 ESSO
- Backups,
- Fixed a bug in the ingest for overdue projects. It was merging rather than replacing. Huge! Files!
- Deployed new version of PA. Still a bug with dates WRT incomplete projects.
- Loooooooooong meeting with Tangie, Carla, Lenny, Chris, Dong and I. Dong is adding the action items to the req’s page.
- May start with some new tools – a Financial Assistant (FA) app that will allow creation and editing of budget center information, and Program Manager Assistant (PMA) that will allow for streamlined management of projects.
- I think we should do this in JDeveloper or GWT.
- Some WCC getting acquainted emails and such.
4:00 – 5:00 FP.
- Cleaned up code while figuring things out.
- Added a new effect callback, which went in cleanly. Looking into how to have multiple effects.
Phil 1.3.13
8:00 – 4:00 ESSO
- Viz Tool meeting
- Found a date bug that we’re going to try to fix by Friday’s meeting
- Reset all the alert states to acknowledged, to keep the users from going crazy
- Need to add a way of acknowledging more than one alert. My thought is that we have a table that has the number of alerts that can show before an “acknowledge all” button is shown, and a MOTD list that can contain messages such as the state of the system. Maybe even something that has to be acknowledged.
- Need to add a way to indicate that it’s time to enter data, but not an “overdue” flag.
- Backups
- Need to do a status report. Done
- Worked out how to handle items in PA, when it is time to enter them, but they are not overdue. The states will now be as follows:
- Current. Everything is filled in
- Incomplete. Something is filled in, and the item is not overdue
- Due. It is time to fill out the item (i.e. Between the 1st and 17th of the month is the “Due” period for the previous month
- Overdue. An item that does not have all fields filled in that is past the “Due” date (i.e. the 17th)
- Finished up my security briefings and emailed a scan of the signed form to Carrie.
- Burned a disc containing PA and status for tomorrow.
4:00 – 5:00 FP
- Got the callback working.
- Pulled out setup(), run(), and terminate() methods. Next, I need to play around with the forces and make a moving object. Ideally, I’d like to have the rotating cube pair from the KF demo, but I’ll have to find some good cube code. I might start with spheres. Once I get the collisions behiving in a way that I like, I’ll start trying to add the code to (a copy of!) the KF demo
Header file:
class GravityWellClass
{
public:
GravityWellClass(void);
~GravityWellClass(void);
bool setup();
bool run();
bool terminate();
protected:
HDErrorInfo error;
HDSchedulerHandle hGravityWell;
HHD hHD;
static HDCallbackCode HDCALLBACK gravityWellCallback(void *data);
};
the callback method:
HDCallbackCode HDCALLBACK GravityWellClass::gravityWellCallback(void *data)
{
const HDdouble kStiffness = 0.075; /* N/mm */
const HDdouble kGravityWellInfluence = 40; /* mm */
/* This is the position of the gravity well in cartesian
(i.e. x,y,z) space. */
//static const hduVector3Dd wellPos = {0,0,0};
hduVector3Dd wellPos;
HDErrorInfo error;
hduVector3Dd position;
hduVector3Dd force;
hduVector3Dd positionTwell;
HHD hHD = hdGetCurrentDevice();
/* Begin haptics frame. ( In general, all state-related haptics calls
should be made within a frame. ) */
hdBeginFrame(hHD);
/* Get the current position of the device. */
hdGetDoublev(HD_CURRENT_POSITION, position);
memset(force, 0, sizeof(hduVector3Dd));
/* > positionTwell = wellPos-position <
Create a vector from the device position towards the gravity
well's center. */
wellPos[0] = 0;
wellPos[1] = 0;
wellPos[2] = 0;
hduVecSubtract(positionTwell, wellPos, position);
/* If the device position is within some distance of the gravity well's
center, apply a spring force towards gravity well's center. The force
calculation differs from a traditional gravitational body in that the
closer the device is to the center, the less force the well exerts;
the device behaves as if a spring were connected between itself and
the well's center. */
if (hduVecMagnitude(positionTwell) < kGravityWellInfluence)
{
/* > F = k * x <
F: Force in Newtons (N)
k: Stiffness of the well (N/mm)
x: Vector from the device endpoint position to the center
of the well. */
hduVecScale(force, positionTwell, kStiffness);
}
/* Send the force to the device. */
hdSetDoublev(HD_CURRENT_FORCE, force);
/* End haptics frame. */
hdEndFrame(hHD);
/* Check for errors and abort the callback if a scheduler error
is detected. */
if (HD_DEVICE_ERROR(error = hdGetError()))
{
hduPrintError(stderr, &error,
"Error detected while rendering gravity welln");
if (hduIsSchedulerError(&error))
{
return HD_CALLBACK_DONE;
}
}
/* Signify that the callback should continue running, i.e. that
it will be called again the next scheduler tick. */
return HD_CALLBACK_CONTINUE;
}
Lastly, the setup method that establishes the callback:
HDSchedulerHandle hGravityWell = hdScheduleAsynchronous(gravityWellCallback, 0, HD_MAX_SCHEDULER_PRIORITY);
Dong Shin 01.03.2012
- Weekly Status meeting(?)
- Found PA not working properly with project status and current month – fixed
- going through Security Training
Phil 1.2.13
8:00 – 3:00
- Backed up
- Got admin privileges on my development box, so I can try a variety of flash players to see what gives with the old version of PPM
- Working on figuring out what timesheet and what charge number to use.
- Also working on getting the security videos to download. Done. Need to sign and send off the form
- Worked on the design of the new Ingest Manager / Scripting IDE. Req’s here.
- Long chat with Jessie about Novetta/FGM/White Cliffs.
3:00 – 4:00 FP
- Changing HelloHapticDevice2 to classes. Need to figure out how to do C++ callbacks inside of classes again.
- Ran into some odd problems that were fixed by moving all the shared .h files to stdafx.h and just including that. The static callback is set and compiling. Tomorrow we’ll try firing it.
Phil 12.31.12
8:00 – 12:00 ESSO
- Deployed a new version of PPM that seems to be working much better than the old version
- Backups. Slow, but at least I can get on the server
- Security training.
12:00 – 4:00 FP
- Switched over to the HD command-line examples to see what’s actually going on. Code is better commented, and seems to run better. There aren’t any peculiar error messages, at least, and no GLUT.
- Looking through HelloHapticDevice.
- Got a copy of the project built with MSVC working (i.e. with stdafx, etc.) I had to move a copy of msvcrtd.lib to the lib folder that was explicitly included. Otherwise, here are screenshots of the various properties (Note the Active(DebugAcademicEdition) configuration at the top of the dialog:





- And that’s it for 2012.
Dong Shin 12.29.2012
- PPM bug fixes in Project Status
- Date Acceptance Received not saving – fixed
- Obligation and Outlay not showing when it’s $0 – removed for some reason… put it back -fixed
- retrieve Funding Request data sorted on Description
- added dataGridDefaultSort to TableAdbDataGrid.mxml
Phil 12.28.12
8:00 – 12:00 ESSO
- Walked through some bugs with Lenny.
- Attempted to back up but the connection with PuTTY was way slow. It seems to be a known problem, so I’ll wait until Monday to try again.
- Helped Brian out with some JavaScript/HTML that handles collapsing tables. The code was not written well to educate.
12:00 – 4:00 FP
- Got the HLAPI demonstration code compiled, though some things run and some things don’t. I get errors like “Haptics failed to initialize”. Still, “HelloSphere” works, which is enough to get the hang of things.
- Hmm. Looks like it’s written for OGL 1.x?
- Still, pretty cool. I’ve got a rotating cube with appropriate forces:
- Also a teapot. So arbitrary geometry seems fine.
- Still, I don’t like this:
// Start a new haptic shape. Use the feedback buffer to capture OpenGL // geometry for haptic rendering. hlBeginShape(HL_SHAPE_FEEDBACK_BUFFER, gSphereShapeId);
- That does mean OGL 1.x. No feedback buffer in OGL 3.0 or greater. That means this library probably won’t be all that useful.
Phil 12.27.12
8:00 – 12:00 ESSO
- Backups, plus some coordination with the Pit Crew.
- Dong’s pass has been renewed.
- Meetings
12:00 – 4:00 FP
- Got the power supply for the Phantom
- Installing drivers from here
Yay!
- Starting on the OpenHaptics Programmer’s Guide. And playing around with the demos a bit.
Phil 12.26.12
8:00 – 4:00 ESSO
- Backed up the databases on site.
- Took some training that I didn’t think I needed, but I was on the email list, soooo…
- Sent an email to Chris and Dave to renew Dong’s pass
- Went home on account of the weather. So I’m setting up my work environment again. Hopefully it’s not that broken.
- Huh. My Tomcat instance seems to be missing. Downloading. Installed.
- Getting the config files and databases from fgmdev.
- Am now able to compile and run Vis2
- Can’t get the “new user / no column header” bug to happen.
- Starting on adding font size to legend and panel titles.
Phil 12.20.12
8:00 – 4:00 ESSO
- Demo prep all day yesterday and demo this morning.
- Add ability to change font size in panel and legend
- Paperwork for white Cliffs. Trying to contact Athena.
Dong Shin 12.20.2012
- spent past few days to prep for Col. Duke’s demo – went well today.
- fixed PA not showing correct project status – one month off!
Phil 12.14.12
8:00 – 4:00 ESSO
- Backups. And everything is *still* working on the production server!
- Worked some with alerts before going off to a GAO meeting and then a meeting with Jim G. The upshot is closer integration with GAO.
- Submitted paperwork for school reimbursement before switch to White Cliffs.
Dong Shin 12.14.2012
- added type column to alerts table
- reworked alert queries and stored procedures to use new type column – VSSUpdates121412.sql
Dong Shin 12.13.2012
- working at home
- filling out SF86 via e-Qip – done!
- security training – Annual Security Awareness ~ Counterintelligence Portion
- deploy for tomorrow
- rebuilt Visibility 3
- scripts and queries for VSS



You must be logged in to post a comment.