Phil 8.25.2010

8:00 – 11:00 VISIBILITY

  • Fixed some aspects of Joe Noble’s account. Ingested some more data
  • Had a talk with John W.
    • John Gresh is leaving in a few weeks
    • Mike Cowan is probably leaving near Jan 1.
    • The current site will probably switch over to SharePoint, with an export of some kind going to SiteWorks. John wants to hand of the SharePoint work to us. I told him that we could probably automate a lot of it, including the SiteWorks export.
  • Walked through PPM with Dong

11:00 – 3:00 FP

  • Provisional patent. At page 8, in the Preferred Embodiment section

3:00 – 6:00 Savage Mill

  • Chairs, desk, fans, build out contacts, etc.