Phil 12.17.2009

8:00 – 5:30

  • Found a bug adding a user. Needed to add an xml stub to the UserInfoObject
  • Updating the project and building a disk
  • Adding more icons to pirate demo
  • Some _dataprovider problems in AdvancedQueryWidget – fixed

Phil 12.16.2009

7:30 – 4:30

  • JW would like training materials (maybe just documentation) for a visit to satellite sites for training in late January
  • Need to make a query that returns no values pop up an alert that says something
  • Look into adding “Map” tab to AdvancedQueryWidget if there is LAT/LATITUDE and LONG/LONGITUDE as column headers. Not sure if clicking on columns would have any effect in this case.

Phil 12.15.2009

7:00 – 4:30

  • Nothing new at the client. Did mention that we were moving VISIBILITY from development to maintenance, so that a new developer could come online when the project was restarted. Got a generally supportive set of noises for that.
  • Need to make a query that returns no values pop up an alert that says something
  • Got everything working under MvnAssist. Need to get Mike to try out the new version.
  • Mantech Demo

Phil 12.14.2009

7:30 – 3:30

  • JW is not really interested in anything other than documentation at this point. Wants to “take a break” from development
  • Needed to fix a few things that were discovered with mvnAssist when we tried to build the Visibility3 webapp
  • Need to get NetWar widget up on LaurelDemo done
  • Got Visibility3 mostly working. Having problems with user objects?

Phil 12.11.2009

8:00 – 4:00

  • 10:30 meeting at S2F
  • More getting IngestManager to behave. Fixed
  • All flex components are now stored as components or projects in the svn repository and in the Edge maven Repo
  • Got a demo map widget working. Need to fold it into visibility

Phil 12.10.2009

7:30 – 5:30

  • All quiet at the customer site this morning
  • Testing DatabaseIf fix – Yep, I had killed a few other things getting the fix to work. All seems back to normal now.
  • Then back to ConfigManager2. The problem is that the LoginScreen is loading first, before the ConfigManager has been configed. Working on changing the order

Phil 12.9.2009

7:00 – 4:30

  • Deployed debug version of ImageCanvas at the fort, and naturally enough, everything is working fine…
  • 11:00 meeting with S14
  • Weird problem: ConfigManager does not seem to be visible in the ManagementUtils project. It compiles file, but becomes null(?) at runtime in LoginScreen.mxml. Is this because it’s a dynamic class? Trying a singleton pattern to see if that works better
  • Fixed a bug in DatabaseIf.java that allowed reserved words to mess up ingestion. All column headers are backticked now.

Phil 12.8.2009

8:00 – 4:30

  • Set permissions for billet tables to be visible to more users
  • Deployed new version. Backgrounds are still not showing up. Added a bunch of logging for every event a loader can throw.
  • Working on getting server projects to work in mvnAssist. It’s working, but I ran into a problem with IngestManager, where it can’t connect to the server. Tomorrow.
  • Meeting at Boeing? – nope

Phil 12.7.2009

7:30 – 4:30

  • Talked to JW this morning about enclave clone. He says to submit anyway, and it will be put into the correct pipe atthe right time. We may move to OCEANSURF as well.
  • More imagecanvas work. Pretty much done. Added alpha and nailed the loading
  • Worked on getting the Visibility project into MvnAssist, but stopped due to the fact that flexmojos doesn’t seem to support server projects.

Phil 12.4.2009

7:00 – 6:00

  • Working on image loading timing issues. Pretty much done, but I had to make a new ImageCanvas class that extends Canvas. It turns out that it’s impossible to set the bitmap for the background directly any other way.
  • 10:00 meeting with Brian at ITMC
  • 1:00 meeting at ops1 with Cassandra
  • Need to give Brian Chralie’s proposal. Brian says to tell John that we can’t move on the enclave proposal until NG starts paying *us*
  • Transition Vis2 to mvnAssist – nope – Tom left early

Phil 12.3.2009

7:30 – 4:30

  • Deployed tool with color chooser
  • Work on S14 req’s
  • Transition to MvnAssist project? Nope – tomorrow
  • Got images as backgrounds, but they don’t load up from the xml all the time. May have to have the app go out and get them special.

Phil 12.2.2009

7:30 -5:00

  • Worked on getting Charlie to put together a proposal for our enclave
  • Prep for Boeing meeting
  • Made some fixes to Vis2, deployed to LaurelDemo anbd burned a disk
  • Worked with Dong a bit for requirements

Phil 12.1.2009

7:30 – 4:00

  • Got the customer’s Edge server restarted. Everything seems to be working fine. We’ll see after the update.
  • Writing up October and November Status reports
  • Working on color picker.
    • Add alpha
    • Read user xml for config
    • Set values before making widget visible
    • Look into setting image for bg (combobox)
  • Need to make a small fix to MvnAssist  so that the repo browser only stores a selection if it is a leaf node
  • Wrote up status report

Phil 11.30.2009

8:00 – 4:30

  • Tried to restart the customer’s Edge server and discovered I don’t have permissions to do that. Sent around emails to make this happen tomorrw. The goal is to see if there are any odd configurations before a new patch rollout on Wednesday
  • Worked on the Color Chooser
  • Talked to Dong about the use cases for VisForms. And yes, this sounds something like a naming convention. I think Visibility should become VisCharts, and we’ll have a VisReports sometime in the future. Pleasantly, vischarts.com, visforms.com, and visreports.com are all available

Phil 11.27.2009

7:30 -12:00

  • Everything is working at a very empty fort
  • Working on theme picker
  • Tom THinks that he may have everything working under MvnAssist. If so he’ll start writing it up.