8:00 – 4:00 ESSO
- Tried out the test plan that JR and I put together last Friday. It went well, and she’s going to see how Vern wants it integrated into the actual test plan
- It looks like that the email-based system will be used for about 14 of the PMs until they are able to connect to the VisTool. So that means that we need to tweak that part of the tool
- All emails for a peorson should be listed in the “cut and paste” email that’s generated. If there is no email in a particular field, then it should probably read “unset” rather than blank or some unprintable character, which is what’s happening noe.
- August is misspelled.
- We need to write a script that produces a table with user, project, description, status, and month (for the last 4 months maybe?) as rows. This will let us produce reports in VISIBILITY.
- Back to putting in help/guidance in FlexiChart. Done!
- Add scrolling frame for series manipulation