Start: 10:30
- Built one of the boards.
- Tested the voltage levels. The branches output 12v and 5volt respectively.
- Setup a sketch to test the boards
- Tested leads to figure out which sensor and speaker they are for. They are sorted left to right.
end: 6:30
