8:30 – 4:30 VISIBILITY
- Well, I’m back. Fin vacation. pix are at http://www.flickr.com/photos/21701734@N04/sets/72157627607863835/ if you’re interested.
- Went over what Dong has been working on. We’re going to see if his form work can be used as the basis for the Project Manager’s wizard
- Tried loading up Mike’s code, and discovered that there was a POM file, which did could not find the parent POM. Waiting for M2 to update indices. Works with the command line/mvnAssist
- Looks like I was pointing at the default m2 settings.xml file. Re-indexing.
- Working now
- Mike came over to check in the Java side of the code and help me build it. We installed on Google. About to try it on the phone proper.
- Yay! Success!
- Going over to check on our new desks and talk to Bill
