7:30 – 5:30 VISIBILITY
- Meeting with Trish
- Rename appropriations so that the year is in parens – i.e. R&D (FY10)
- Make sure that the change ripples across the tables. It does not change in the Funding Request dialog
- Have a line for each Direct Cite and for Reimbursable in financial status
- And clicking on each line should bring up a unique dialog for that line
- No ComboBox for Appropriation at the top of the Financial Status panel. Instead, on the right-hand side of the panel, have an appropriation year and appropriation month ComboBox. These should default to the correct month year for the project based on today’s date. In other words, if the money for the contract was appropriated (using project create) on Oct 1 2009 (i.e. FY10), and today is Oct 1 2010, then it’s October (month 1) of year 2.
- Add a global refresh
- Add an ‘Initiate’ Column and a ‘Commit’ Column to replace the Initiate/Commit’ column currently in the financial status
- Add an ‘Initiate’ field and a ‘Commit’ field to replace the Initiate/Commit’ field currently in the funding request
- Percent in financial status needs to be calculated against the goal percentage based on the current month/year in the appropriation cycle
- Had another power failure last night – still need a UPS
- Looking through Tomcat documentation to see if I can find what’s going on with my problem child server
- SSL configuration How-To: http://tomcat.apache.org/tomcat-7.0-doc/ssl-howto.html
- The http connector: http://tomcat.apache.org/tomcat-7.0-doc/config/http.html
- Tomcat 6.0 SSL, how to set up client Authentication
- Java HTTPS setup
- How CERN does it.
- Step by step tutorial to create Keystore and Truststore file
- Chased down the error a bit more – it’s (related to?) ssl_error_rx_record_too_long.
- It may be related to running APR (Although I think I’m not running that)
