Phil 9.22.2010

8:00 – 4:00 VISIBILITY

  • Mary M had uploaded and attempted to ingest a big spreadsheet. It still had some formatting and didn’t work. I removed the formatting and re-ingested. She’ll be out until the 25th, so we’ll have to wait to see how that worked out
  • Installed the new SWF from Dong. All appears to be working and it looks like all the users have been added.
  • Asked Dong to put together an “about” panel that has the compiled date in it. That turned out great. I’m going to add that to the other pieces of VISIBILITY
  • Working on self-assessment – waiting for some definitions
  • Back to Flex in a week
    • Day 1 Episode 8
    • Day 1 Episode 9
    • Day1 Episode 10

KF

  • Wired up the 32′ USB extension cable, which appears to work fine. Need to re-tune the SG amps
  • Going to start cutting some metal for the hand plate tonight

FGM

  • Team Lunch

Phil 9.21.2010

7:30 – 11:30 VISIBILITY

  • Exchanged email with Mary M who’s with SLA, I think. She’s attempting to upload items and wants to use the Ingest Manager
  • Everything else is working fine. Some use by Anne G and Mary Mof the demo databases
  • Burning new PPM swf to disk

11:30 – 3:30 FP

  • Finished paper
  • Formatting paper for SIGCHI Archival format – done and submitted!

Dong Shin 09.21.2010

  • adding more tooltips
    • Funding Request
  • fgmdev.com mounted as /Volumes/FGMDEV-SSH, /uploads mounted as /Volumes/FGMDEVuploads using Macfusion. Now I can copy the files
  • downloaded and installed AMFPHP 2.0, looks more portable
  • deployed the latest PPM to fgmdev.com

Dong Shin 09.20.2010

  • fixed a bug not showing contracts on projects with multiple fundings
  • added tooltips to buttons on Create Project Panel
  • moved Financial Data Edit progress bar to title bar
  • added global amount_labelFunc to format amounts data accesible at Application.application level
    • Budget Centers in Create Project
    • Budget Centers in Funding Request
    • Project Financial Info in Financial Data Editor

Dong Shin 09.17.2010

  • trying to map sftp://fgmdev.com to local drive
  • found some useful utils
  • more feedbacks from customer
  • added Activity Amount to each Financial Data (by FY)
    • really careful adding components because of the ordered data retrieval
  • removed Total Budget validator – not needed because it’s calculated and not editable
  • Mailing Address POC and Mailing Address are blanks on Create Funding Request
  • corrected NSA Portfolio Mgr on Funding Request
  • added ToolTips for Reported Outlay $: and PM Actuals Outlay $:
    • used ItemRollOver and ItemRollOut instead of DataTips function
    • Amounts entered must be cumulative

Phil 9.17.2010

8:00 – 12:00 VISIBILITY

  • Data Visualizer running smoothly on site, but also very little use in the middle of the month
  • Rolled out the new BETA swf of PPM for Trish and Chris.
    • Contract info is not showing up in financial entry
    • Financial request POC should be blank
    • NSA Project Manager fields are pulling NSA Financial Manager data
    • Need to add a line for budget totals above financial grids
    • Need to add tooltips to “type” colum entries in financial entries

FP 12:00 – 4:00

  • Working on SigCHI paper.

Dong Shin 09.16.2010

  • changed all ProjPortolioMgr static references to Application.application
  • Added FY Totals Grid to Create/Modify Project Panel
  • Financial Data with total of 0 removed from the View
  • Individual Data with funding of 0 removed from the View
  • disable Create User on non-admin

Mike 9.16.2010

  • Added special cases to the python autocomplete so it includes the methods listed in the drop-down
    • declaring any variable as “mySF = ScriptFascades()” will successfully bring up auto complete options for mySF later in the script
    • same deal for “myTable = mySF.dbQuery(…”, myTable will be recognized as a dbTable object
  • Left the dropDown in the GUI because there’s a few options I can’t reproduce like identifying an alertInfoObject and constructors

Phil 9.16.2010

7:30 – 12:30 VISIBILITY

  • Things are running smoothly on site
  • Nobody is poking around in the Data Navigator right now, which makes me worried about the level of seriousness by the SLA folks
  • Trish and Chris didn’t enter any new user data
  • Talked to dong about the state of the current PPM system, and showed him a few screenshots from onsite.

12:30- 3:30 FP

  • Working on SigChi Paper. Need to finish the description and discussion sections.

Dong Shin 09.15.2010

  • looking into creating branches for the release
  • found that I had been using svn://viz-n.com, ughh! tried svn copy and svn switch, but doesn’t seem work.
  • assisted Phil enter new Appropriations
  • got the latest feedbacks from customer
    • removed user description
    • login id built from the first name and last name
    • made Save User button bigger
    • change TRP Member label to NSA PM Name and show Portfolio Mgr
    • added FT Name and FT Number to Financial Data tab labels
    • made Budget Centers on Create/Modify Project Panel sortable
    • Non-admin users can only edit own information

Phil 9.15.2010

7:30 – 2:00 VISIBILITY

  • Meeting with Trish and Chris. Rolled out the “release version. This led to several changes being requested. Dong is working on rolling in changes so I can deploy Friday am.
    • Remove description from user registration
    • login should be firstname.lastname. Add a tooltip
    • Users should be able to edit their own user data
    • Make “Save User” button bigger. Says Save Us…
    • If the budget for a year is zero, don’t show or calculate panels
    • TRP Member in financial Data should read “NSA PM Name” and show NSA portfolio Manager
    • Total budget needs to be total budget by year (use a grid rather than a single field)
    • Financial tabs need FT Name and FT Number added to “Year XX” label
    • Make project rows sortable

2:00 – 3:30 FP

Dong Shin 09.14.2010

  • working at home
  • created beta.png to use for the background of ProjPortfolioMgrBeta.swc
  • packaged ProjPortfolioMgr.war
    • fresh database with minimal set of data – project_portfolio_complete.sql
    • only user pgfeldman as Admin
    • ProjPortfolioMgr.swc for users and ProjPortfolioMgrBeta for testing and debugging
  • packaged ProjPortfolioMgrAlpha.war
    • use project_portfolio_dev database
    • load testing data – project_portfolio_complete_test_data.sql
    • changed the configuration to use new database
  • Uploaded files to viz-n.com

Mike 9.13.2010

  • Combined all the flex classes which make up the scripting text area: PrettyPrintTextArea extends CodingTextArea extends AutoCompleteTextArea
  • added a language selector to the scripting editor screen, currently only python with my test language turned off
  • Worked through bugs and oddities which appeared from combining all the text functionality (example, the auto indent spaces were still appearing after an auto complete insert even though a newline wasn’t started)
  • The autocomplete stuff is incorporated, checked in, and turned on, not the most robust but it does work for the basic cases and reports errors when it gets confused (as opposed to the crash and burn method)