8:00 – 4:00 VISIBILITY
- Mary M had uploaded and attempted to ingest a big spreadsheet. It still had some formatting and didn’t work. I removed the formatting and re-ingested. She’ll be out until the 25th, so we’ll have to wait to see how that worked out
- Installed the new SWF from Dong. All appears to be working and it looks like all the users have been added.
- Asked Dong to put together an “about” panel that has the compiled date in it. That turned out great. I’m going to add that to the other pieces of VISIBILITY
- Working on self-assessment – waiting for some definitions
- Back to Flex in a week
- Day 1 Episode 8
- Day 1 Episode 9
- Day1 Episode 10
KF
- Wired up the 32′ USB extension cable, which appears to work fine. Need to re-tune the SG amps
- Going to start cutting some metal for the hand plate tonight
FGM
- Team Lunch
