7:30 – 1:30 VISIBILITY
- SSL for Firefox is misbehaving. Waiting for that to be fixed. All the deployed apps are working fine though
- Catching up with Dong. Looks like I’ll demo the version installed last week
- Working on the “Sailor” display
- Burning a new Vis disk
- Power failed at Columbia, went to the client. Spent a few hours doing the newest Visibility deploy. Since my certs were misbehaving, the svn transfer trick didn’t work any more. Joe set me up with a remote disk which works very nicely.
1:30 – 3:30 FP
- Reinforced the azimuth component of the main support so the strain gauges should work better
- Added the base
- Discovered that the arms that come off the large motors are not strong enough to grip the shaft. Part of this is that there is no standard drill bit that corresponds to 8mm, so the holes for the shaft were too large. Wound up having to order a metric drill set from McMaster. You would think that Harbor Freight would have that, but nope.
