Phil 6.7.2010

7:30 – 2:30 (VISIBILITY)

  • Deployed new Vis and VSS. The query logging is set up and running
  • Dropped by JM. Full walkthrough is set for tomorrow
  • Telecon with WPAFB? Nope – postponed till tomorrow.
  • Walked through PPM with Dong – found a few bugs. Iterating.
  • Burned a disk to try tomorrow.

2:30- 3:30 (FP)

  • Added normalized sensor values. Spent a while figuring out a good way to have a center value that offsets the results