7:30 – 3:30
- Deployed new documentation in a test URL for JW to look at
- Walked through the new S14 app with JM. Lots of notes – I called Dong and passed them along.
- Meeting with Anne and a large group from S2A(?). Made the pitch that they pay for the development of a deployable version of VISIBILITY, which they liked
- Need to put in the role editing that I worked out before the move. Done. Need to test
